Sunday, May 30, 2010

THE SOLAR STORAGE FLOOR



The steel beams are installed with metal decking on top. A tree inch thick layer of rigid insulation is installed on top of the metal decking. Then the vapor barrier on top.





















A mat of re-bar is installed on top of the vapor barrier. Spacers called "high chairs" are placed under the re-bars to space them 1-1/2" above the bottom of the concrete slab.


















The heat tubes were then installed atop the re-bar mat. Welded wire mesh was then placed on the very top of the slab to reduce cracking when the concrete shrinks during the curing process.



This is a view of the heat tubes as they exit the new heat storage & collector concrete slab and then enter the existing crawl space.